Tag: Tram
Ground stabilization work causing significant noise will begin in June at the southern end of Hakunilantie
Ground stabilization works will begin at the southern end of Hakunilantie in week 26. The work is estimated to continue until the end of August 2026. The work will cause significant noise in the area as well as changes to traffic arrangements. As part of these changes, the bus stop on Vaaralantie
Noisy work phases planned on the median strip of Porvoonväylä at Länsimäentie and in the Maratontie area in July–August
On the Porvoonväylä at the intersection with Länsimäentie and near the Maratontie roundabout, work will be carried out during the summer that will cause noise. At the turn of June and July, rock blasting will take place in the central lanes, which may result in loud noise and temporary traffic
The City develops Vantaa light trail tram communication based on resident survey results
The City conducted a resident survey on light rail tram-related communication, receiving nearly 400 responses. The results show that residents particularly want more up-to-date, practical information about how construction affects their daily lives locally. Over the summer, the City will test
The signal-controlled intersection of Old Porvoo Road and Kyytitie will be converted into a temporary roundabout during the night between Tuesday, 16 June, and Wednesday, 17 June.
The roundabout is expected to remain in use in the area until autumn 2027.
Noise intensive drilling, excavation and deep compaction works to begin in June at the Vaarala depot
At the Vaarala depot, rock drilling, excavation and deep compaction works will begin in June. The works will cause significant noise in the area. The works will start in week 25.
Detour on Tilustie due to water utility works
Construction of water and wastewater infrastructure on Tilustie will begin in week 24. The detour built in the area will be taken into use in stages as the work progresses.
Forests are more than individual trees - Vantaa Light Rail compensates for the harm caused by construction to nature
We use an app to track the number of individual street trees that have been cut along the light rail route. This ensures that an equivalent number of new trees can be planted as close as possible to the original locations.
The Vantaa light rail airport terminus proposal for the City Executive Board has been completed
The proposal for the terminus in the airport's core area, created by the Vantaa light rail alliance in cooperation with Finavia, has been completed. The proposed terminus is located on Terminaalitie. The Vantaa City Executive Board will address the proposal on June 8, 2026.
Rock drilling with a percussion drill will be carried out on Kyytitie in June between Salpakuja and Porttisuontie – the work will cause significant noise in the area.
During June, percussion drilling will be carried out on Kyytitie between Salpakuja and Porttisuontie. The work will cause occasional high noise levels in the area when drilling is in progress. Noisy work will be carried out on weekdays from 7:00 to 18:00.
Traffic arrangements will change on Hakunilantie due to renovation of the Hevoshaantie underpass
The renovation of the Hevoshaantie underpass will begin in early June, and the traffic arrangements required by the works will be implemented in week 23. The changes will affect both vehicle traffic and pedestrian and cycling connections. The underpass will remain in use throughout the renovation.